Jump to content

Hit List

Search Results

NR title Research center Project status project start end of project ▼
24.00608 Defining Clinical and Molecular Phenotypes of Multi-Drug Resistance in difficult to treat RheumatoidArthritis SERI In Process 31.12.2024 30.12.2029
SI/502717-WP4 CO2-Electrolysis for Synthesis Gas Production SFOE In Process 31.12.2023 30.12.2029
04.04 Bundesbeitrag an das Forschungsinstitut für biologischen Landbau, Frick FOAG In Process 31.12.2001 30.12.2029
25.00393 COdesign urban REalm & dynamic Spaces management for cognitive & socially connected cities SERI In Process 31.12.2025 30.12.2029
25.00403 Safety and Multi Hazard Identification for resilient European Hydrogen Infrastructure and Logistics Development SERI In Process 31.12.2025 30.12.2029
SI/502544 LANTERN – Living labs interfaces for the energy transition SFOE In Process 31.05.2022 30.12.2029
24.00011 Personalised response monitoring in oncology: co-creating clinical trials in advanced breast cancer SERI In Process 31.12.2023 30.12.2029
CTR01123 ENSI Inspection Robot: Radiation Resistant Detection Droid (R2D2) ENSI In Process 29.05.2025 30.12.2029
25.00288 Event-based LEarning, Vision, And conTrol for Embodied systems SERI In Process 31.12.2025 30.12.2029
25.00346 The role of cellular mechanical stress in the pathogenesis of neurodegenerative disorders SERI In Process 31.12.2025 30.12.2029
SI/502544-WP2 Set up and scale up SFOE In Process 31.05.2022 30.12.2029
CTR00284 Felslabor Mont Terri ENSI In Process 28.05.2007 30.12.2029
25.00389 Machine Learning Computational Advancements for peRsonalized mEdicine SERI In Process 31.12.2025 30.12.2029
0142007054 Untersuchungsdaten im Rahmen der Evaluation des Neugeborenenscreenings auf Zystische Fibrose SFOPH In Process 31.12.2024 30.12.2029
25.00440 Decentralized critical Infrastructure Asset Monitoring and coNDition assessment (DIAMOND) SERI In Process 31.12.2025 30.12.2029
SI/502544-WP3 Living Lab methodologies SFOE In Process 31.05.2022 30.12.2029
AF_MoVo2025-2030_2.18 MoVo 2025-2030_Schönthal-Park als interkommunaler Entwicklungsinkubator im Ergolz-Talraum ARE In Process 31.03.2026 30.12.2029
24.00489 Next Generation Modelling of Terrestrial Carbon Cycle by assimilation of in situ campaigns and Earth Observations SERI In Process 31.12.2024 30.12.2029
SI/502957 Leitung Forschungsprogramm Solarthermie und Wärmespeicherung SFOE In Process 15.06.2025 30.12.2029
AF_MoVo2025-2030_5.22 MoVo 2025-2030_Gesund im Bestand: Bezahlbare und soziale Transformation in Bern ARE In Process 28.02.2026 30.12.2029
AF_MoVo2025-2030_5.31 MoVo 2025-2030_SAGENMATT 7 - Postindustrielle Transformation an der Reuss ARE In Process 31.03.2026 30.12.2029
SI/502868 IEA Hydropower TCP SFOE In Process 31.12.2024 30.12.2029
25.00380 European Training Network on Integrating AI in Proteomics: From Data Acquisition to Translational Applications SERI In Process 31.12.2025 30.12.2029
SI/502544-WP10 Integrated Impact Assessment SFOE In Process 31.05.2022 30.12.2029
SI/503003-WP16 NEST Beyond.Zero SFOE In Process 30.11.2026 30.12.2029