Jump to content

Hit List

Search Results

NR title Research center Project status project start end of project ▼
24.00629 Next Generation Modelling of Terrestrial Carbon Cycle by assimilation of in situ campaigns and Earth Observations SERI In Process 31.12.2024 30.12.2029
8T20/25.0101.PJ HF5 Forschung Risiken Chemikalien reduzieren FOEN In Process 31.08.2025 30.12.2029
24.00533 A European wide network of livestock advisors well embedded in their AKIS ecosystems and exchangingpractical knowledge in the long-term for sustainable livestock production SERI In Process 31.12.2024 30.12.2029
25.00440 Decentralized critical Infrastructure Asset Monitoring and coNDition assessment (DIAMOND) SERI In Process 31.12.2025 30.12.2029
04.04 Bundesbeitrag an das Forschungsinstitut für biologischen Landbau, Frick FOAG In Process 31.12.2001 30.12.2029
CTR00284 Felslabor Mont Terri ENSI In Process 28.05.2007 30.12.2029
SI/502957 Leitung Forschungsprogramm Solarthermie und Wärmespeicherung SFOE In Process 15.06.2025 30.12.2029
AF_MoVo2025-2030_5.22 MoVo 2025-2030_Gesund im Bestand: Bezahlbare und soziale Transformation in Bern ARE In Process 28.02.2026 30.12.2029
25.00255 Sociology of Authoritarian Law: Insights from Central Asia SERI In Process 31.12.2025 30.12.2029
25.00423 SOLUTIONS FOR CIRCULAR WATER AND DECENTRALISATION SERI In Process 31.12.2025 30.12.2029
23.00337 European Partnership on Transforming Health and Care Systems SERI In Process 31.12.2022 30.12.2029
24.00410 European Partnership on Transforming Health and Care Systems SERI In Process 31.12.2022 30.12.2029
25.00393 COdesign urban REalm & dynamic Spaces management for cognitive & socially connected cities SERI In Process 31.12.2025 30.12.2029
SI/502544-WP3 Living Lab methodologies SFOE In Process 31.05.2022 30.12.2029
24.00500 MOLECULAR STRATEGIES AGAINST VIRAL ENTRY AND GLYCAN SHIELDING SERI In Process 31.12.2024 30.12.2029
SI/502721-WP6 The role of the regulatory and societal frame-conditions SFOE In Process 30.09.2023 30.12.2029
SI/502544-WP10 Integrated Impact Assessment SFOE In Process 31.05.2022 30.12.2029
24.00614 A European Proactive Adaptive Clinical Trials Network within EU-Response SERI In Process 31.12.2024 30.12.2029
AF-MoVo2025-2030_2.7 MoVo 2025-2030_Entwicklungskonzept Stadtrandpark Winterthur ARE In Process 31.03.2026 30.12.2029
25.00387 Digital Endocrinology Training Network to combat adrenal diseases SERI In Process 31.12.2025 30.12.2029
25.00409 COdesign urban REalm & dynamic Spaces management for cognitive & socially connected cities SERI In Process 31.12.2025 30.12.2029
SI/502544-WP2 Set up and scale up SFOE In Process 31.05.2022 30.12.2029
25.00403 Safety and Multi Hazard Identification for resilient European Hydrogen Infrastructure and Logistics Development SERI In Process 31.12.2025 30.12.2029
25.00311 Right-time Adaptive Particle Therapy Of canceR - Personalisation through anatomical plus biologicaladaptation SERI In Process 31.12.2025 30.12.2029
SI/502495 SWICE – Sustainable well-being for the Individual and the collectivity in the energy transition SFOE In Process 31.03.2022 30.12.2029