Jump to content

Hit List

Search Results

NR title Research center Project status project start ▲ end of project
SI/502620 Réseaux anergie avec sources primaires décentralisées SFOE Finished 28.02.2023 30.12.2024
SI/502639 Feasibility study on the potential of block-chain to ensure traceability of guarantees of origin for V2X SFOE Finished 28.02.2023 30.12.2023
8T20/23.0013.PJ AP PSM – Bodenmonitoring 2023-2028 FOEN In Process 28.02.2023 30.12.2028
23.00131 States’ Practices of Human Rights Justifications: A study in civil society engagement and human rights through the lens of gender and intersectionality SERI In Process 28.02.2023 27.02.2026
23.00415 European Network in Coding Theory and Applications SERI In Process 28.02.2023 27.02.2027
711-2023 Studie zur Untersuchung der Einführung der Tarifstruktur TARPSY SFOPH Finished 28.02.2023 30.12.2024
23.00122 A Design Study for a Muon Collider complex at 10 TeV center of mass SERI In Process 28.02.2023 27.02.2027
23.00115 New science in Radio Astronomy: applying cutting-edge technology to enhance the entire data chain, fromreceiver to final output. SERI In Process 28.02.2023 27.02.2027
ExSt.2024.1660 INFORME FINAL PROYECTO GESTIÓN AMBIENTAL MUNICIPAL Evaluación de Impacto, Bolivia SDC Finished 28.02.2023 28.02.2023
23.00163 ERA TALENT Platform for career development of researchers in Europe SERI In Process 28.02.2023 27.02.2026
22.00342 Research Training to Design and Implement Tools Supporting Safe Teamwork in Healthcare SERI In Process 28.02.2023 27.02.2027
23.00123 A Design Study for a Muon Collider complex at 10 TeV center of mass SERI In Process 28.02.2023 27.02.2027
6.23.01 FSVO Finished 28.02.2023 30.10.2023
SI/502544-WP8 Energy Communities and Cooperatives at District Level SFOE In Process 28.02.2023 30.05.2027
23.00111 Enhancing the In-situ Environmental Observations across Under-sampled Deserts - CiROCCO SERI In Process 28.02.2023 27.02.2026
SI/502544-WP6 Sustainable Mobility SFOE In Process 28.02.2023 30.05.2023
22.00551 Improving treatment efficacy in hypertension by biomarker-guided personalised decision support SERI In Process 28.02.2023 27.02.2029
SI/502544-WP5 Energy in work SFOE In Process 28.02.2023 30.05.2026
SI/502544-WP7 Affordable and energy efficient housing and retrofitting SFOE In Process 28.02.2023 30.05.2023
23.00133 Craft Understanding, Education, Training, and Preservation for Posterity and Prosperity SERI In Process 28.02.2023 27.02.2026
F-5232.30177 METAS Finished 28.02.2023 30.05.2025
SI/502605 BioMeth – A novel direct biogas upgrade to biomethanol concept SFOE In Process 28.02.2023 30.08.2027
103.926 IP-ENG Development and optimization of eco (GWP < 1) high voltage circuit breaker INNOSUISSE Finished 02.03.2023 15.05.2025
ExSt.2023.1592 Akzeptanz aktueller Fussgängerhinweissysteme (AVAS) in der Schweizer Bevölkerung FOEN Finished 05.03.2023 05.03.2023
UTF 712.32.22 FOEN In Process 05.03.2023 30.01.2025